Our Projects
Ft. Leonard Wood Army Hospital – Bldg. 310
Project Summary:
BE-Cl was engaged to provide the design, fabrication, installation and certification of the anchor points and equipment which for the Permanent Fall Protection System. BE-CI also performed water testing and Quality Assurance site observations on one hundred percent (100%) of the windows on Towers A, B and C.
At the conclusion of the project, BE-CI provided a letter of opinion with a summary of our observations and recommendations to the conditions observed as it related to the windows and window seals. The overall cost of the restoration project was $2,000,000.
Location:
Ft. Leonard Wood, Missouri
Size:
472,600 sq. ft.
![Image link](https://be-ci.com/wp-content/uploads/2020/01/Fort-Leonard-Wood-Army-Hospital1-min.jpg)
![Image link](https://be-ci.com/wp-content/uploads/2020/01/Fort-Leonard-Wood-Army-Hospital2-min.jpg)
![Image link](https://be-ci.com/wp-content/uploads/2020/01/Fort-Leonard-Wood-Army-Hospital3-min.jpg)
![Image link](https://be-ci.com/wp-content/uploads/2020/01/Fort-Leonard-Wood-Army-Hospital4-min.jpg)
![Image link](https://be-ci.com/wp-content/uploads/2020/02/Fort-Leonard-Wood-Army-Hospital5-min.jpg)